
Electrostatic Chuck Surface Feature Machining
- Material and workpiece
- 12-inch alumina electrostatic chuck
- Bump depth
- 15.5 μm±1 μm
- Bump diameter
- 0.85 mm±0.01 mm
北京凝华科技有限公司APPLICATION SOLUTIONS
Across advanced ceramics and superhard materials, assess processes and machine configuration against the part, material, critical features and acceptance requirements.
SEMICONDUCTOR PART SOLUTIONS
5 part solutions

Start with the plate surfaces and microfeatures
Sintered blank & allowance → datum/plate grinding → contours & grooves → helium holes/passages → surface finishing → microfeatures → cleaning & part acceptance
Explore the part solution ↗
Balance stock removal with embedded-feature protection
Incoming part & protected regions → plate/datum grinding → connecting features → thermocouple holes/lead passages → local laser features → surface finishing → cleaning & geometric/functional acceptance
Explore the part solution ↗
Connect ring support, setup datums & profile requirements
Ring blank & allowance → conditional contour pre-machining → support/datum grinding → contour/step finish grinding → surface finishing → cleaning & geometric/application acceptance
Explore the part solution ↗
Define hole type, depth & edge requirements first
Blank & datums → plate/contour grinding → dedicated hole-pattern machining → conditional local-feature branches → surface finishing → cleaning/patency checks → hole-pattern & application acceptance
Explore the part solution ↗Define whole-part & local-feature machining scope first
Integral/separate blank → machining space & datums → local supporting features → segmented slot grinding → between-slot checks/wheel feedback → edges & assembly → cleaning & full-length acceptance
Explore the part solution ↗No matching solution. Contact NINVA to discuss your part.
INDUSTRY APPLICATIONS
OPERATION VALIDATION



VALIDATE YOUR MACHINE SELECTION
Share the part, material, critical requirements and output objectives to discuss candidate machines, trials and configuration.
An account manager responds within 24 hours. Trials generally take 3–20 days; an NDA is available.